Project: New Build Care Home & Private Flats

Project value: £400,000
Project style: Design & Build
Client: Walter Thompson Construction
Project Duration: 9 Months (May 2011 – Feb 2012)

This project was a design, supply and installation of the Mechanical & Plumbing Services incorporating the following aspects:

  • Above Ground PVC drainage.
  • Domestic H&CWS distribution.
  • Hot water generation incorporating low carbon
  • and renewable technologies to meet planning requirements (Solar thermal & ASHP)
  • Mechanical Ventilation
  • Internal & External Gas Installation
  • Aluminium Rainwater Installation
  • Sanitary ware Installation
  • Comfort Cooling